New Step by Step Map For Cast in Situ Piles
In the course of the preparation of the Doing the job platform and ahead of the start on the drilling, an investigation need to be carried out to assure the absence of any obstructions within the pile spots.Demolition of the surplus concrete earlier mentioned the Reduce-off stage shall be carried out by operatives using jackhammers.All Operative sh